GROUP ASSIGNMENT 

Project Management

 

This group assignment constitutes 30% of the total assessment. 

A property Developer intends to develop a piece of freehold land measuring 10 acres 1 rood 10 pole beside Taylor’s University, Selangor. The land was purchased three years ago at RM15.00 per sq. ft. with a RM6,500,000.00 bank loan. During this period, the Developer had applied for land conversion, subdivision, planning and building plans approval.

The proposed development shall be of mixed residential and commercial units comprising of 26’ x 80’ double storey shop/office lots, 22’ x 75’ double storey Terrace houses and 20’ x 60’ double storey Low Cost houses. Thirty percent (30%) of the development must be of low cost houses. The Developer intends to have fifteen percent (15%) of the total units to be double storey shop/office.

Development Order has now been granted and construction is ready to proceed. Construction shall take two years to complete.

As the project manager and cost consultant engaged for the proposed project. 

Therefore, in a group of 6, we were needed to prepare a report.

The report should include, but not limit to the following:

  1. Project Background

  2. Project Justification – Development Economics

  3. Project Quality Management

  4. Project Risk Analysis

  5. Project Summary

From this assignment, I’ve learned to produce a thorough project analysis. Furthermore, I’m able to conduct the application of processes, methods, knowledge and skills to achieve the project objectives. Most importantly, I’ve noticed the fundamental value of quality and risk management of a project. Through proper planning, controlling and monitoring on quality and risk, we can avoid unnecessary cost incurred on our project. It is then I came to realize that actually there’s several structured techniques and tools for quality and risk management to help in projecting a proposed development to keep a construction project up to standard and reduce its risks by identifying, analyzing and controlling throughout its project cycle.​